Storage: ClimaWrap must be kept dry and out of contact with alkaline products, cement and mortar.
Installation Recommendations:
ClimaWrap shall be installed in accordance with AS/NZS 4200.2 Pliable Building Membranes and Underlays, Part 2 Installation Requirements. ClimaWrap shall be installed horizontally as a continuous membrane by xing to all framing members with the printed side facing out, from the top plate to the bottom plate on concrete slabs or bearers in timber constructions. Joins must be overlapped by 150mm to maintain weather tightness. To achieve an air barrier, all joins, cuts and penetrations shall be taped using seaming tape.
Ensure to repair any damage or tears to ClimaWrap to maintain the integrity of the membrane.